Tools Required: You can use wood working machinery for cutting, sawing, drilling and so on. Bases Requirements: Walls should be solid, stable, smooth and level. High points must be removed,…
Deck Flooring
Preparation: Before start installing, ensure that the ground is solid, smooth (The recommended deviation should less than 5 mm) and clean. For muck foundation, it is necessary to lay a…